Data Center

2025

Data Center

Liquid Cooling system
Maximum pipe size: 12″
Installation method: Both grooved and welded connections
Project phases: Phase 1 and Phase 2
Phase 2: IST completed 20 days ahead of schedule
PUE: Lower than 1.4